Skip to main content

ASB

ASB // Renovation of the Amsinckstraßen bridge over the Mittelkanal in Hamburg.

CN Europlan GmbH - 09.10.2020 - Amsinckstrassenbrücke - Abrissd
Aerial view of demolition
CN Europlan GmbH - 09.10.2020 - Amsinckstrassenbrücke - Abrissd
Cutting and lifting of prestressed concrete bean
CN Europlan GmbH - 09.10.2020 - Amsinckstrassenbrücke - Abrissd
Aerial view of demolition

As part of revitalization of the Amsinckstrassenbrücke, a 1956, two-span prestressed concrete bridge over the Mittelkanal, was demolished.

OUR SERVICES
Concept design until detailed design

Size
Bridge span: 2 x 17m
Width: 43m

FEATURES IN KEYWORDS
Recalculation of the prestressed concrete girders for the new dismantling and transport condition taking into account the bridge damage